Urban Steel Retrofit Project Baltimore
Located in Mount Vernon, one of Baltimore’s historic neighborhoods, we fabricated and erected structural steel and miscellaneous metals for the conversion of a former nightclub into this innovative and modern 37,000-square-foot, eight-story work/retail venue known as City House Charles.

Project Overview
This urban steel retrofit project in Baltimore, MD with seven stories of floor-to-ceiling windows and new mixed-use Class A office and ground-floor retail space, this Baltimore project sets a new standard for converting historic properties into attractive and highly desirable business and leisure accommodations.
New Construction or Renovation?
Because of extreme site constraints – tying into two stand-alone walls and abutting existing buildings – this project felt much like a renovation. Existing historic buildings are located to the north and east. The structure that previously occupied the site was demolished, with the exception of two brick walls at the corner of North Charles Street and Eager Street. These historic walls are being incorporated into the new building and had to be shored and stabilized before we could attach new structural steel. Ensuring the free-standing walls remained erect and plumb was the first of many challenges.
Being Part of the Solution
Every project has challenges, but this one tested the team’s creativity and resilience. From the tight site and renovation-like conditions to excessive groundwater, success required patience, innovation, and extra precautions.
For example, while the general contractor was digging the new basement, the foundation of an adjacent building sank by about 2.5 inches. This shift meant our prefabricated steel beams no longer fit. Crews had to field-modify the beams on site, reducing their lengths to make the structure work.
Overcoming Tight Site Conditions
Due to the urban location, we utilized a portable tower crane for its smaller size, quick setup time, and improved operator line of sight. Our erection crew also used two tag lines instead of the typical single line, providing better control when maneuvering steel between existing buildings and tying into stabilized historic walls.
While the project required only 276 tons of structural steel, we broke the erection sequence into 26 parts. By increasing deliveries, we minimized the amount of steel staged on site to what could be erected in a single day. Even with this plan, the general contractor used much of the limited laydown space, so we adapted again. After decking the western portion of the building, we erected steel in the center area we had previously used for daily laydown. For Phase 2, we staged steel atop the completed structure to keep progress moving.
Teamwork Leading to Success
Despite challenges including tying into existing walls, dealing with sunken foundations, and managing a constrained jobsite, our team remained focused. Project Manager Mitch Noll and Foreman Gerardo Madrigal-Lupian led the crew with steady leadership, finding solutions for every obstacle. Their expertise ensured this 37,000-square-foot, eight-story work/retail venue stayed on track for its December 2021 completion.
Takeaway – Building the Future from the Past
This project demonstrates how Kinsley Steel thrives in complex conditions. By combining historic preservation with innovative steel construction methods, we delivered a durable, modern structure that enhances Baltimore’s historic neighborhood while overcoming every challenge on the path to completion.